Energy Renovation of the Judicial Court

Nanterre (92)

Rénovation énergétique Renovation Justice Île-de-France 2024
Tribunal_de_Nanterre_2_-WA0005.jpg
tribunal_nanterre.jpg
Tribunal_de_Nanterre.jpg

Stakeholders

Client: Ministry of Justice

Architect: PATRIARCHE

Stakeholders: PATRIARCHE, GAMBA, GTA, LES ECLAIREURS

Description

Design-build project for the energy renovation of the Nanterre Judicial Court (92), as part of the France Relance recovery plan.

The building is part of the Nanterre Administrative Complex, designed by A. Wogenscky and delivered in 1973. Its architectural identity is protected and must be strictly preserved.

It includes 6 above-ground levels with a total gross floor area (SHON) of 20,000 m².

The building features 4 mainly glazed façades, with an interior courtyard starting from the 2nd floor and expanding into an indoor garden on the 3rd floor.

Energy Performance Objectives:

  • 57% reduction in final energy consumption compared to the existing building
  • 66% reduction in conventional energy consumption

Technical and usage specifications

  • ERP classification: Category 2
  • Work carried out on an occupied and constrained site (GN13, sensitive and secure location)
  • Renovation of energy systems
  • Regulatory compliance with enhanced safety requirements
  • Asbestos removal of residual asbestos-containing materials, particularly in the façades

Informations and key numbers

  • Delivery year : 2024
  • Type of work : General Contractor and Lead Partner